The balcony repair project is now finished.

webassets/LayingTile.JPG

webassets/TileLaid.JPG

Replacing the tile removed to repair the balconies and walls in Tower II was an important step in the process and helped to ensure a watertight joint between the balcony floor and the siding. 

webassets/Paintstripping.JPG



Stripping and repainting of the balcony railings followed closely on the heels of re-tiling.  This view is of one of the "4 stack" of Tower I being stripped for repainting.